District 1

For more information on any of the projects listed here, please click the links below, or contact my office at (505) 468-7010.

To see a county-wide, on-going project map, please click here.

District 1 Public Works Projects
  • An adaptive signal control system is a designated set of traffic signals that effectively communicate with each other to improve overall traffic flow along a respective corridor. The traffic signals ...

  • Project Scope In an effort to physically consolidate the various departments located throughout the county and to reduce our environmental footprint, Bernalillo County has purchased the Alvarado S...

  • Project Scope Construction of this project includes: pulverizing existing pavement and repaving with new pavement section; Install infiltrators parallel to the road where drainage issues are found...

  • Project Scope Bernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greate...

  • Two memorials will be dedicated to honor and remember law enforcement officers, firefighters, corrections officers and first responders who have given their lives protecting others. Those being me...

  • 2/2/2017
    Project Scope The community process and planning analysis during the Parks Recreation and Open Space Facilities Master Plan (PROS Plan) identified a need for a new community facility in the Mid-No...

District 1 Parks, Recreation and Open Space Capital Projects
  • 5/31/2017
    Project Scope The community process and planning analysis during the Parks Recreation and Open Space Facilities Master Plan (PROS Plan) identified a need for a new community facility in the Mid-No...

  • The county recently completed Phase 1 construction of the Edward G. Sandoval North Valley Little League project with four new fields and a parking lot. Phase 2 design is underway, which will inclu...

  • A multi-purpose trail was proposed for the Middle Rio Grande Conservancy District Alameda Drain-2nd Street Corridor. This project is being led by the county’s Public Works Division in collaboration w...

  • The community process and Parks and Recreation Open Space Master Plan planning analysis identified a need for recreation facilities in the Mid-North Valley. The county has recently acquired a piece o...

  • During the public process, especially the meetings in Districts 1 and 4, there was considerable interest expressed in a North Valley swimming pool. The spacial analysis of pool facilities and level o...

View All Events
Latest News
Upcoming Events
  • Master planning for future development of parks and recreation facility, including satellite community center/possible museum, recreation features, outdoor classrooms, trail and parking improvements.
    Location:
    North Valley Command Center, 6900 4th Street NW
    Time:
    1/17/2018 6:00 PM