✖ Close Social Content

For more information on any of the projects listed here, please click the links below, or contact my office at (505) 468-7010.

To see a county-wide, on-going project map, please click here.

  • Scope This project reconstructed the asphalt paving on Tramway Lane from Tramway Blvd to Tramway Lane Court. Reconstruction included pulverization/compaction of existing asphalt surface and placem...

  • Project Scope Traffic Control Plan, (permitted through NMDOT). Removal, site preparation and grading of existing landscape. Excavate, verify and connect to existing lateral irrigation pipes. Insta...

  • Project Scope The scope of the Paradise Hills Trail Improvements Project is along Paradise Boulevard, NW from Golf Course Road, NW west to La Paz Drive, NW. It consists of improvements to existing...

  • An adaptive signal control system is a designated set of traffic signals that effectively communicate with each other to improve overall traffic flow along a respective corridor. The traffic signals ...

  • Project Scope  This project provides roadway and signal improvements to allow emergency vehicles direct access to Paseo del Norte from county Fire Station #35, located on the Paseo del Norte front...

  • Project Scope This project includes the assessment, design and ultimate construction of a sewer system servicing a neighborhood in the North Valley of Albuquerque. It is intended to protect and en...

  • Project Scope Bernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greate...

View All Events
Latest News
Upcoming Events
    Powered by Real Time Solutions - Website Design & Document Management