✖ Close Social Content

To navigate these projects, please refer to the organizing tabs located below, on the right side of the page.

For a list of completed projects, click here



Search posts:

Bernalillo County contracts with ABQ Ride to provide bus service in both the North and South Valleys. In the past few years ABQ Ride has used American Recovery and Reinvestment Act (ARRA) funds to install 45 bus shelters along County routes (in ... Read More


An adaptive signal control system is a designated set of traffic signals that effectively communicate with each other to improve overall traffic flow along a respective corridor. The traffic signals adapt to the traffic flow, reducing the frequency o... Read More


 

Project Scope

This project involves creating an Alameda Drain Comprehensive Land Management and Multi-Use Corridor Master Plan (Master Plan) for the Alameda Drain Trail from I-40 north to the Sandia Pueblo Boundary.  The Master Plan will de... Read More


This project the design/construction of a multi-use trail adjacent to the Alameda Drain from Montaño Road to Osuna. The project will follow the guidance as set forth in the Alameda Drain and Trail Master Plan. It will design the multi-use trai... Read More


Project Scope

Traffic Control Plan, (permitted through NMDOT). Removal, site preparation and grading of existing landscape. Excavate, verify and connect to existing lateral irrigation pipes. Install weed barrier fabric and landscape aggregate. Plant: ... Read More


Project Scope

In an effort to physically consolidate the various departments located throughout the county and to reduce our environmental footprint, Bernalillo County has purchased the Alvarado Square property, 415 Silver Ave. SW. The building acquis... Read More


The Bernalillo County Fleet and Facilities Department/Facilities Construction Program is currently assisting the Bernalillo County Animal Care Services Department in the construction of a new Animal Shelter at a site near 2nd and Woodward.

The new Ani... Read More


Project Scope

Services to design curb and gutter and multi-use trail along the east side of 118th St. from Dennis Chavez Blvd to the Middle School Entrance. Additionally, design services to design a new paved access roadway from eastern Atrisco Herita... Read More


The Barcelona Road Storm Drain Project Phase I is a tributary of the South Valley Flood Reduction Project. This project consists of road and drainage improvements for Barcelona Road from the Armijo Drain to the Isleta Drain.

Drainage Improvements will... Read More


The project consists of roadway improvements at the Blake Road and Coors Boulevard intersection and storm drain improvements that will capture runoff at the intersection and will connect to the Isleta Drain.

Roadway improvements shall consist of the w... Read More


The Bernalillo County Board of Commissioners adopted the Bridge Boulevard Corridor Redevelopment Plan on Aug. 27, 2013, completing a two-year planning process to engage the South Valley community regarding the future of this vital community... Read More


Bridge Boulevard Reconstruction Project Phase I (approximately West of Goff to Old Coors, Tower from Old Coors to Coors) which will be a multi-jurisdictional planning/design effort that will eventually lead to the construction of an improved intersec... Read More


Bridge Boulevard Reconstruction Project Phase II (approximately West of the Barelas Bridge to Atrisco Ditch) which will be a multi-jurisdictional planning/design effort that will eventually lead to the construction of an improved intersections and mu... Read More


Project Scope

Construction of this project includes: pulverizing existing pavement and repaving with new pavement section; Install infiltrators parallel to the road where drainage issues are found on Ranchitos Road; placing new paving section on Calle... Read More


Scope

This project installed asphalt paving on 6,925 linear feet of existing gravel roads in the East Mountains area. The paved 1,760 linear feet Oakhill Drive/Sharp Road that serves the Sandia Knolls subdivision was pulverized and new asphalt placed.... Read More


Project Scope

Construction of this project includes: Import of fill, construction of paved trail, drainage improvements and striping for bike lanes along Eubank Blvd from Wilshire to Alameda.

Funding: County Trail Bonds

General Project Information:

Statu... Read More


Project Scope

Fiber OpticsBernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greater bandwidth to carry digital information. Ind... Read More


This project involves the design and construction of 300 feet of storm drain on Hooper Road SW. The project has State Capital Improvement Project funding. The project will provide necessary drainage on Hooper Road.

General Project Information:

Sta... Read More


Project Scope

This project includes the assessment, design and ultimate construction of a sewer system servicing a neighborhood in the North Valley of Albuquerque. It is intended to protect and enhance groundwater quality in the region through the ult... Read More


Project Scope 

Bernalillo County is undertaking a series of improvements to the Paradise Hills Community Center and nearby facilities, including Paradise Hills Park, Park Lane, and Paradise Hills Pool. A phased suite of improvements proposed for ... Read More


Next
Powered by Real Time Solutions - Website Design & Document Management