✖ Close Social Content
Public Works


08/30/2016

Two memorials will be dedicated to honor and remember law enforcement officers, firefighters, corrections officers and first responders who have given their lives protecting others. Those being memorialized are fallen Bernalillo County, Cit... Read More


08/23/2016

Project Scope 

Bernalillo County is undertaking a series of improvements to the Paradise Hills Community Center and nearby facilities, including Paradise Hills Park, Park Lane, and Paradise Hills Pool. A phased suite of improvements proposed for ... Read More


05/03/2016

Project Scope 

The county will be constructing the following roads under the program: Sharp Road (from Sharp Court to Olive Road), Darby Drive (from Olive Drive to Longview Road) and Longview Road (from Darby Road to end of road) in the east moun... Read More


04/19/2016

Edith Property Background -  On Sept. 28, 2015, Bernalillo County finalized the purchase of the 17 acres of property in the North Valley that was once the home to the Sandia Ranch Hospital, 6903 Edith Blvd. NE. The purchase price was just o... Read More


04/14/2016

Project Scope

Reconstruct Sunset Road SW between Goff Blvd SW to Bridge Blvd SW. The roadway reconstruction will include pedestrian/multimodal, signing, and drainage improvements along with other appurtenances as necessary. All roadway intersecti... Read More


03/07/2016

Project Scope

This project will design and construct a multi-use trail from the Valle de Oro Wildlife Refuge entrance to Mountain View Elementary School; reconstruct Second Street from Valle de Oro Wildlife Refuge entrance to Desert Road; realign Dese... Read More


02/10/2016

Project Scope

This project consists of reconstructing Tower Road from Stinson Street east, roughly 1,000 feet. The design will provide two driving lanes in each direction, bicycle lanes, completion of storm drainage infrastructure, installation of wat... Read More


02/02/2016

Project Scope

This project provides roadway and signal improvements to allow emergency vehicles direct access to Paseo del Norte from county Fire Station #35, located on the Paseo del Norte frontage road between Browning and Lowell Streets. These impr... Read More


01/28/2016

Project Scope

Vista del Rio, Phase 4 will construct a storm drain system (Phase 4A) in Vista del Rio Road, Elena Circle, Rinconado Lane, Perry Road, and Blake Road that will be collected in a new pond that will have a pump station (Phase 4B) that will... Read More


01/25/2016

Project Scope

The project consists of roadway improvements between Bridge Boulevard and the Isleta/Arenal/Goff intersection and storm drainage improvements between Bridge Boulevard and the Sanchez Farm Pond in accordance with the “Sanchez Farm P... Read More


01/25/2016

Project Scope

Sunset Gardens Road Phase 2The project reconstructed Sunset Gardens Road, SW from the Arenal Acequia to Sunset Road, SW, then continued on Sunset Road SW to Trujillo Road SW, and continued east on Trujillo Road SW where it crossed an easement into the Va... Read More


01/13/2016

Project Scope

The scope of this project is to widen the roadway and provide bicycle lanes along Rio Grande Boulevard from the Los Ranchos boundary to Alameda Boulevard. 

Schedule: Project is currently in the design phase. 

A communit... Read More


01/04/2016

Second Street Trail, Prosperity Avenue to South Diversion Channel

 

 

Project Scope

This project will design and construct a 10-foot wide asphalt multi-use trail along the east side of Second Street, from Prosperity Avenue to the South Diversio... Read More


01/04/2016

Project Scope 

The county constructed the following roads under the program: Phase 1 consisting of Meadows Drive in the east mountain area; Phase 2 which consists of Avenida La Mirada, Tuna Place, Peno Place, Nogal Place, Piedra Road and Lutes Co... Read More


12/22/2015

Scope

The existing Edith Blvd asphalt surface was milled and a new asphalt surface placed between Montano Road and Osuna Road. Damaged sidewalk segments were reconstructed.

The existing Vineyard Road asphalt, between Second Street and Ro... Read More