Project Scope: Scope includes the construction of a new underground storm drain along Arenal Road between Coors Boulevard and the Isleta Drain. The project will collect existing developed underground storm water flows coming from the NMDOT ... Read More


Project Scope 

The county constructed the following roads under the program: Phase 1 consisting of Meadows Drive in the east mountain area; Phase 2 which consists of Avenida La Mirada, Tuna Place, Peno Place, Nogal Place, Piedra Road and Lutes Co... Read More


Scope

The existing Edith Blvd asphalt surface was milled and a new asphalt surface placed between Montano Road and Osuna Road. Damaged sidewalk segments were reconstructed.

The existing Vineyard Road asphalt, between Second Street and Ro... Read More


Scope

This project reconstructed the asphalt paving on Tramway Lane from Tramway Blvd to Tramway Lane Court. Reconstruction included pulverization/compaction of existing asphalt surface and placement of new asphalt. Tramway La... Read More


Fire Station 41
10838 Highway 337
Tijeras, NM

Project Overview

 A 7,250 square foot building addition to Bernalillo County Fire Station 41 is going to be constructed.

The addition will include two apparatus bays and new living quarters. The exis... Read More


Fire Station 46
25 Frost Road
Sandia Park, NM

Project Scope

A 7,250 square foot building addition to Bernalillo County Fire Station 41 is going to be constructed.

The addition will include two apparatus bays and new living quarters. The existing port... Read More


Project Scope

The project consists of roadway improvements between Bridge Boulevard and the Isleta/Arenal/Goff intersection and storm drainage improvements between Bridge Boulevard and the Sanchez Farm Pond in accordance with the “Sanchez Farm P... Read More


To read the Environmental Evaluation of the Proposed Developed by Bernalillo County Public Works of the Luna Properties-Tijeras, New Mexico, please click here.

This project has been completed. 


Certificate of Occupancy has been issued Interior of the library has had it's final cleaning by the restoration company Vinyl composition tile (VCT) has been stripped and waxed All Williamson Restoration equipment has been removed from the j... Read More


Project Scope

Exsisting Trail Segment at Paradise Hills Project SiteThe scope of the Paradise Hills Trail Improvements Project is along Paradise Boulevard, NW from Golf Course Road, NW west to La Paz Drive, NW. It consists of improvements to existing sections of trail and the construction of new sec... Read More


Project Scope

This project provides roadway and signal improvements to allow emergency vehicles direct access to Paseo del Norte from county Fire Station #35, located on the Paseo del Norte frontage road between Browning and Lowell Streets. These impr... Read More


Rio Grande Indoor Pool
2312 Arenal Road SW
Albuquerque, NM  87105
(505) 314-0169

The Bernalillo County Aquatics program follows the National Lightning Safety Institute recommendations for its indoor and outdoor pools.


This project consists of geometric improvements to the intersection of Sage Road SW and Old Coors Road SW. The project includes adding 11-foot dedicated turn lanes, installation of permanent signals, improved lighting and ADA/crosswalk improvements.

(... Read More


This project is a joint effort of Bernalillo County, the Albuquerque Bernalillo County Water Utility Authority (ABCWUA), the State of New Mexico through legislative funding and federal funding through the state's Congressional delegatio... Read More


This facility is located at 2008 Larrazolo Road SE

Project Scope

A new 3,250 square foot building addition to the South Valley Multipurpose Center is currently in design.

The new addition will be used for half-court basketball and many other approp... Read More


Project Scope

Sunset Gardens Road Phase 2The project reconstructed Sunset Gardens Road, SW from the Arenal Acequia to Sunset Road, SW, then continued on Sunset Road SW to Trujillo Road SW, and continued east on Trujillo Road SW where it crossed an easement into the Va... Read More


Project Scope

Vista del Rio, Phase 4 will construct a storm drain system (Phase 4A) in Vista del Rio Road, Elena Circle, Rinconado Lane, Perry Road, and Blake Road that will be collected in a new pond that will have a pump station (Phase 4B) that will... Read More