✖ Close Social Content
Public Works

To navigate these projects, please refer to the organizing tabs located below, on the right side of the page.

For a list of current projects, click here. 


All Posts > District 2

Bernalillo County contracts with ABQ Ride to provide bus service in both the North and South Valleys. In the past few years ABQ Ride has used American Recovery and Reinvestment Act (ARRA) funds to install 45 bus shelters along County routes (in ... Read More


Project Scope: Scope includes the construction of a new underground storm drain along Arenal Road between Coors Boulevard and the Isleta Drain. The project will collect existing developed underground storm water flows coming from the NMDOT ... Read More


Project Scope

The project consists of roadway improvements between Bridge Boulevard and the Isleta/Arenal/Goff intersection and storm drainage improvements between Bridge Boulevard and the Sanchez Farm Pond in accordance with the “Sanchez Farm P... Read More


Rio Grande Indoor Pool
2312 Arenal Road SW
Albuquerque, NM  87105
(505) 314-0169

The Bernalillo County Aquatics program follows the National Lightning Safety Institute recommendations for its indoor and outdoor pools.


This project consists of geometric improvements to the intersection of Sage Road SW and Old Coors Road SW. The project includes adding 11-foot dedicated turn lanes, installation of permanent signals, improved lighting and ADA/crosswalk improvements.

(... Read More


This project is a joint effort of Bernalillo County, the Albuquerque Bernalillo County Water Utility Authority (ABCWUA), the State of New Mexico through legislative funding and federal funding through the state's Congressional delegatio... Read More


This facility is located at 2008 Larrazolo Road SE

Project Scope

A new 3,250 square foot building addition to the South Valley Multipurpose Center is currently in design.

The new addition will be used for half-court basketball and many other approp... Read More


Project Scope

Sunset Gardens Road Phase 2The project reconstructed Sunset Gardens Road, SW from the Arenal Acequia to Sunset Road, SW, then continued on Sunset Road SW to Trujillo Road SW, and continued east on Trujillo Road SW where it crossed an easement into the Va... Read More


Project Scope

Vista del Rio, Phase 4 will construct a storm drain system (Phase 4A) in Vista del Rio Road, Elena Circle, Rinconado Lane, Perry Road, and Blake Road that will be collected in a new pond that will have a pump station (Phase 4B) that will... Read More


Powered by Real Time Solutions - Website Design & Document Management