Arenal Storm Drain

Project Scope: Scope includes the construction of a new underground storm drain along Arenal Road between Coors Boulevard and the Isleta Drain. The project will collect existing developed underground storm water flows coming from the NMDOT Coors Boulevard and Arenal Road intersection infrastructure. The storm drain will be designed to maximize collection of as much local drainage, to the north and south, along Arenal Road as possible. The storm water will outfall into the Isleta Drain. 

This is a tributary project to the South Valley Flood Reduction project.   

Project Site Map

Project Gantt Chart

General Project Information:

Status | Preliminary Design
Project Engineer | Amor Solano, P. E.
Design Consultant | HDR Engineering, Inc.
Estimated Design Cost | $428,000
Project % Completed | 60%
Construction Contractor | TBD
Estimated Construction Cost | $2,500,000
Current Status: Completed

Project Contact Information:
Amor Solano, P.E.
(505) 848-1527
asolano-hood@bernco.gov