✖ Close Social Content

For more information on any of the projects listed here, please click the links below, or contact my office at (505) 468-7010.

To see a county-wide, on-going project map, please click here.

District 2 Public Works Projects
  • Updated: Nov. 30, 2017 The Bernalillo County Fleet and Facilities Department/Facilities Construction Program is currently assisting the Bernalillo County Animal Care Services Department in the con...

  • Project Scope Services to design curb and gutter and multi-use trail along the east side of 118th St. from Dennis Chavez Blvd to the Middle School Entrance. Additionally, design services to design...

  • Project Scope Bernalillo County has undertaken the Atrisco Vista Boulevard study to evaluate roadway safety improvements three miles from Double Eagle Road north to Paseo del Norte and for exte...

  • Updated Oct. 16, 2018 Project Scope The Barcelona Road Storm Drain Project is a tributary of the South Valley Flood Reduction Project. This project consists of road and drainage improvements...

  • The project consists of roadway improvements at the Blake Road and Coors Boulevard intersection and storm drain improvements that will capture runoff at the intersection and will connect to the Islet...

  • The Bernalillo County Board of Commissioners adopted the  Bridge Boulevard Corridor Redevelopment Plan  on Aug. 27, 2013, completing a two-year planning process to engage the South Valley community r...

  • Bridge Boulevard Reconstruction Project Phase I (approximately West of Goff to Old Coors, Tower from Old Coors to Coors) which will be a multi-jurisdictional planning/design effort that will eventual...

  • Bridge Boulevard Reconstruction Project Phase II (approximately West of the Barelas Bridge to Atrisco Ditch) which will be a multi-jurisdictional planning/design effort that will eventually lead to t...

  • This project will include a 3-inch asphalt overlay on Foothill Road from Bridge Boulevard to Blake Road with complete asphalt patching in the particularly bad areas. The speed humps will be recons...

  • Project Scope Bernalillo County is installing thousands of feet of fiber-optic cable to establish its own infrastructure for voice and data communications.  The fiber-optic cable provides a greate...

  • This project involves the design and construction of 300 feet of storm drain on Hooper Road SW. The project has State Capital Improvement Project funding. The project will provide necessary drainage ...

  • This project is a collaborative effort between Bernalillo County, the City of Albuquerque and local stakeholders, SWAN (Southwest Alliance of Neighbors) and the West Central Community Development ...

  • Project Scope This project will design and construct a multi-use trail from the Valle de Oro Wildlife Refuge entrance to Mountain View Elementary School; reconstruct Second Street from Valle de Or...

  • Second Street Trail Phase 2, Prosperity Avenue to south of Rio Bravo Project Scope This project will design and construct a 10-foot wide asphalt multi-use trail along the east side of Second...

  • To read the full South Valley Transportation Projects Summary, please download the PDF here .

  • The purpose of this project is to connect Broadway and I-25 at the existing Sunport Blvd. Interchange and close this gap in the area’s transportation network, and address other transportation and acc...

  • Project Scope Reconstruct Sunset Road SW between Goff Blvd SW to Bridge Blvd SW. The roadway reconstruction will include pedestrian/multimodal, signing, and drainage improvements along with other ...

District 2 Parks, Recreation and Open Space Capital Projects
  • Several improvements are recommended for Tom Tenorio Park to enable it to function as a regional tournament complex. Initial improvements will include moving the field from West Side Community Center...

  • Parking and Drainage Improvements: Additional parking areas will be added to the center, including 72 permanent parking spaces, and a flexible overflow parking area/field that can accommodate up t...

  • Additional improvements will be made at this facility to create a Prescription (Rx) Trail for this part of the community, shade structure, parking and lighting upgrades. Phase 1 - Shade structures...

  • The goal for this facility is to complete the existing site plan, which includes a shade structure, outdoor amphitheater/classroom area, and additional agricultural and interpretive elements. In the ...

  • A Prescription (Rx) Trail and new sound system are proposed for these facilities. Additional parking and field upgrades, such as field extensions and artificial turf infields, will be needed in the f...

  • The county would like to expand programming and usage of this facility, particularly with its partners 4-H and the New Mexico State University -Bernalillo County Cooperative Extension Service. To ach...

  • Project Scope The Parks, Recreation and Open Space Facility Master Plan identified acquisition and improvement of agricultural lands north of Rio Bravo as one of the top 15 most important projects...

  • Project Scope The Parks, Recreation and Open Space Facility Master Plan identified renovation and improvement of the South Valley Pool as the highest priority project. The county re-constructed th...

View All Events
Latest news
Upcoming Events
  • The permanence of the genízaro identity blurs the lines of distinction between Native and Hispanic frameworks of race and cultural affiliation. Genízaros, Native American slaves, were house servants, sheep herders, and in other capacities in the New Mexico Territory and parts of southern Colorado well into the 1800s. The presenter, co-editor of a forthcoming anthology along with Dr. Enrique LaMadrid entitled, Genízaro Nation, discussion of genízaro identity and ritual cultural performances. This event is free, but registration is required at the link below.
    Location:
    Gutierrez-Hubbell House, 6029 Isleta Blvd. SW
    Time:
    1/20/2019 1:00 PM - 1/20/2019 2:00 PM

  • Because trees are healthier and produce more foliage and fruit if correctly pruned, learn how to get the most from your trees with this workshop. Course work covers the selection and care of trees, pest and disease prevention, and propagation techniques. A visit to the heritage orchard offers participants a place to apply their new knowledge to the property’s fruit trees. This event is free but registration is required at the link below.
    Location:
    Gutierrez-Hubbell House, 6029 Isleta Blvd. SW
    Time:
    1/26/2019 9:00 AM - 1/26/2019 12:00 PM

  • Teens and children ages 11-19 are invited to participate in Westside Community Center's T33n 3-on-3 basketball each Friday night from 7-10 from March 8 through April 12. Registration begins Jan. 28 and there is no charge to participate. Dinner will be served at 6 p.m. followed by a mandatory 30-minute life skills workshop before the games begin. For more details call Ashley Gutierrez at (505) 314-0465.
    Location:
    Westside Community Center, 1250 Isleta Blvd. SW
    Time:
    3/8/2019 6:00 PM - 3/8/2019 10:00 PM

Powered by Real Time Solutions - Website Design & Document Management