✖ Close Social Content
District 2
  • Contact Information
    Location:
     
    Phone:
    (505) 468-7448
     
    Hours:
    Monday - Friday
    8 a.m. - 5 p.m.
     
    Email:
    ✖ Close Menu
  • Most Popular Pages
      Google.Apis.Requests.RequestError
      Quota Error: profileId ga:34897428 has too many concurrent connections. [403]
      Errors [
      	Message[Quota Error: profileId ga:34897428 has too many concurrent connections.] Location[ - ] Reason[quotaExceeded] Domain[usageLimits]
      ]
      
      ✖ Close Menu
    • Search District 2
      ✖ Close Menu

    For more information on any of the projects listed here, please click the links below, or contact my office at (505) 468-7010.

    To see a county-wide, on-going project map, please click here.

    District 2 Public Works Projects
    • Updated: Nov. 30, 2017 The Bernalillo County Fleet and Facilities Department/Facilities Construction Program is currently assisting the Bernalillo County Animal Care Services Department in the con...

    • Project Scope Bernalillo County has undertaken the Atrisco Vista Boulevard study to evaluate roadway safety improvements three miles from Double Eagle Road north to Paseo del Norte and for exte...

    • Updated May 28, 2019 Almost 300 South Valley property owners received letters the week of Feb. 11, 2019, notifying them of the change in their flood zone status. For the properties removed from th...

    • Project Scope The Barcelona Road Storm Drain Project is a tributary of the South Valley Flood Reduction Project. This project consists of road and drainage improvements for Barcelona Road from ...

    • Project Scope The Barcelona Road Storm Drain Project is a tributary of the South Valley Flood Reduction Project. This project consists of road and drainage improvements for Barcelona Road from the...

    • The Bernalillo County Board of Commissioners adopted the  Bridge Boulevard Corridor Redevelopment Plan  on Aug. 27, 2013, completing a two-year planning process to engage the South Valley community r...

    • Bridge Boulevard Reconstruction Project Phase I (approximately West of Goff to Old Coors, Tower from Old Coors to Coors) which will be a multi-jurisdictional planning/design effort that will eventual...

    • Bridge Boulevard Reconstruction Project Phase II (approximately West of the Barelas Bridge to Atrisco Ditch) which will be a multi-jurisdictional planning/design effort that will eventually lead to t...

    • Project Scope This project is to include the analysis of the existing Foothill Bridge Pond and the feasibility of a proposed connection to the Isleta Drain for the outfall of storm drain waters. W...

    • Project Scope This Project will perform a hydrologic/hydraulic analysis of the Mountain View Neighborhood to identify and alleviate drainage problems and flooding issues within the neighborhood. T...

    • Project Scope Complete repaving of the intersection as well as adding a through lane each way on Rio Bravo. Funding: This project is comprised primarily with state funding but also county fundi...

    • Project Scope Adding a lane each way on Rio Bravo between 2nd street and the South Diversion Channel. Funding: This project is comprised primarily with state funding but also county funding. ...

    • This project is a collaborative effort between Bernalillo County, the City of Albuquerque and local stakeholders, SWAN (Southwest Alliance of Neighbors) and the West Central Community Development ...

    • Updated Nov. 14, 2019 Project Scope This project is to complete the infrastructure improvements necessary to activate the Railroad Quiet Crossing at 2nd Street and Prosperity. Improvements will...

    • Updated Nov. 14, 2019 Project Scope This project will design and construct a 10-foot wide asphalt multi-use trail along the east side of Second Street, from Prosperity Avenue to Rio Bravo Blvd....

    • The purpose of this project is to connect Broadway and I-25 at the existing Sunport Blvd. Interchange and close this gap in the area’s transportation network, and address other transportation and acc...

    • Project Scope Reconstruct Sunset Road SW between Goff Blvd SW to Bridge Blvd SW. The roadway reconstruction will include pedestrian/multimodal, signing, and drainage improvements along with other ...

    District 2 Parks, Recreation and Open Space Capital Projects
    • Several improvements are recommended for Tom Tenorio Park to enable it to function as a regional tournament complex. Initial improvements will include moving the field from West Side Community Center...

    • Parking and Drainage Improvements: Additional parking areas will be added to the center, including 72 permanent parking spaces, and a flexible overflow parking area/field that can accommodate up t...

    • Additional improvements will be made at this facility to create a Prescription (Rx) Trail for this part of the community, shade structure, parking and lighting upgrades. Phase 1 - Shade structures...

    • The goal for this facility is to complete the existing site plan, which includes a shade structure, outdoor amphitheater/classroom area, and additional agricultural and interpretive elements. In the ...

    • A Prescription (Rx) Trail and new sound system are proposed for these facilities. Additional parking and field upgrades, such as field extensions and artificial turf infields, will be needed in the f...

    • The county would like to expand programming and usage of this facility, particularly with its partners 4-H and the New Mexico State University -Bernalillo County Cooperative Extension Service. To ach...

    • Project Scope The Parks, Recreation and Open Space Facility Master Plan identified acquisition and improvement of agricultural lands north of Rio Bravo as one of the top 15 most important projects...

    • Project Scope The Parks, Recreation and Open Space Facility Master Plan identified renovation and improvement of the South Valley Pool as the highest priority project. The county re-constructed th...

    View All Events
    Latest news
    Upcoming Events
    • See flier for details.
      Location:
      Los Padillas Community Center, 2117 Los Padillas SW
      Time:
      12/14/2019 9:00 AM - 12/14/2019 10:00 AM

    • Everyone is invited to the Rio Grande Indoor Pool from noon to 4:45 p.m. on Saturday, Decv. 14 to Swim with Santa! There will be free toys, candy and hot cocoa, plus games and pictures with Santa! The cost is regular admission. Call (505) 314-0169 for more info!
      Location:
      Rio Grande Indoor Pool, 2312 Arenal Rd. SW
      Time:
      12/14/2019 12:00 PM - 12/14/2019 4:45 PM

    • See flier for details.
      Location:
      Los Padillas Community Center, 2117 Los Padillas SW
      Time:
      12/21/2019 9:00 AM - 12/21/2019 10:00 AM

    Powered by Real Time Solutions - Website Design & Document Management