Barcelona Road Storm Drain Project Phase 2

Project Scope

The Barcelona Road Storm Drain Project is a tributary of the South Valley Flood Reduction Project. This project consists of road and drainage improvements for Barcelona Road from the Armijo Drain to the Isleta Drain. Drainage Improvements will capture runoff and will connect to the Armijo Drain. Roadway improvements shall consist of bicycle lanes, curb and gutter, and sidewalk to provide a safe roadway corridor.

The first phase of the Barcelona project consisted of road and storm drain improvements from the Armijo Drain to Joe Sanchez. Also with the first phase a new sidewalk was constructed on the north side of Barcelona between Isleta Blvd and Joe Sanchez. The second phase will construct new road and storm drain improvements from Joe Sanchez to the Isleta drain including sidewalk on the north side of Barcelona. In addition, the following side roads will be reconstructed: Kingsbury Road, Wilkinson Road, La Junta Road, Vega Verde Street, and Yuma Road.

Traffic Control Phasing (with detour routes) for Phase 2A will be provided in the next 3 weeks. La Junta will have to be closed in order to construct a new crossing at the Armijo Drain, and to construct a large manhole at the intersection of Barcelona and La Junta.

Letters announcing that construction of the project was about to begin, were mailed out the week of Oct. 14.


Design Phase 2A & 2B

Design Consultant | WHPacific Inc.
Design Cost | $307,000
Design Notice to Proceed | November 2017
Design is at 100%
Funding: Bernalillo County Road Bonds

Construction

Phase 2A: Between Joe Sanchez Road and La Junta Road

Roads Impacted with Phase 2A are Barcelona Road (between Joe Sanchez and Barcelona Circle West), Wilkinson Road, Kingsbury Road, and La Junta Road.

Construction Estimated Notice to Proceed | Nov. 18, 2019
Construction Estimated Cost | $3,063,750
Contractor: Albuquerque Asphalt Inc.
Funds: Bernalillo County Storm Drain Bonds

Phase 2B: Between La Junta Road and the Isleta Drain

Roads impacted with Phase 2B are Barcelona Road (between Barcelona Circle West and the Isleta Drain), Vega Verde Street and Yuma Road.

Construction Estimated Notice to Proceed | FALL 2020 (depending on funds)
Construction Estimated Cost | $2.4 million
Funds: TBD

Project Contact Information
Christi L. Tanner, P.E., Project Engineer
Office Phone/(505) 848-1523, Cell Phone/(505) 850-2041