Steve Schiff Building HVAC Replacement Project

Bernalillo County Facilities Department has been working with the State of New Mexico Bernalillo County District Attorney’s Office and the Bernalillo County Legal Department on the HVAC construction project at the Steve Schiff District Attorney Building, 520 Lomas NW that will begin in the fall of 2019.

Facilities will be managing the project that consists of removing two failing 130-ton Trane roof top units from the District Attorney’s Office and replacing with two new Trane SLHKD 134 units, the most efficient units that will fit on the roof without having to redesign the structural integrity of the building. two roof top units supply comfort air for 80,000 square feet of office space.

Also included in the construction is the replacement of four 20-year-old heating pumps that are located in the penthouse of the District Attorney’s Office. New Bell and Gossett pumps will consist of having a variable frequency drive so that the new pumps will operate at the required rate, ultimately lowering the financial costs of the monthly utility invoices. Along with two new roof top units, four heating pumps, four variable frequency drive motors; the county is also replacing four indoor Carrier air-handling units that assist in cooling data rooms and the elevator mechanical room.

Old indoor units are outdated due to inefficiency and an obsolete refrigeration system that is no longer allowed to be installed by the Environmental Protection Agency.

General Project Information

Status | Out for bid 

NTP | Not yet awarded (JB Henderson was low bidder, waiting for NTP from Purchasing before we can award the job)

Funding | Bond; Capital Improvement Project

Project Manager | Matt Zamora

Design Consultant/Engineering Firm | Wilson and Company

Contractor | Not yet awarded

Construction Cost | $1 million

Duration | Not yet determined

Design Percent Complete |100%

Construction Percentage Complete | Not yet awarded

Project Contact Information

Matt Zamora

Office: (505) 224-1664

 

 